DATE
January 2020 – July 2020
REFERENCE
Mark Thompson
WESTERN TURNER SYNCLINE to BROCKMAN 4 – PILBARA SURVEYS
Western Turner Syncline to Brockman 4 – Provide Survey coverage for a Road Construction Project from the White Quartz Road to Brockman 1, at 7km in length. Day to day duties included Culvert Setouts and Checks, Clearing Stakes and CP submissions, Drill and Blast Setouts and Pickups, Earthworks Stakes Setout, Topsoil Stockpile Pickups and Volumes, Post Strip Surveys. Provide Machine Control Models in TP3 format for a Grader, Two Excavators and a Dozer. Digital Levelling for 3.6km.