DATE
October 2018 – February 2019
REFERENCE
Niall Pitcher
Channar – Rio Tinto
Rehab Works
Convert data as required between Paraburdoo Mine Grid and MGA Zone 50. Model Waste Dump design against start surface point cloud to determine cut/fill quantities by four area/sector boundaries at one metre intervals of elevation. Control Establishment around waste dump from agreed MGA zone 50 coordinates with Mine Survey. Machine Control Setup and provision of models and support to a D10 Dozer and a D8 Dozer on Topcon Machine guidance and an Excavator on Leica Machine guidance. Surface checks, Asbuilt Survey and Redesigns to meet quantity requirements as required. Drafting of bulk Cross Sections at chainage intervals and heat map cut/fill plans for analysis. Calculate Volumes and Areas for Project completion claims.
Paraburdoo
Survey Setout of clearing lines for haulage route and earthworks fill on a Landfill site. Setout of Heritage Areas and avoidance zones. Machine Control Setup and provision of models and support to a Grader, D10 Dozer and a D8 Dozer on Topcon Machine guidance. Survey pickups for progress volumes with final pickup and heat map provision for analysis and calculations for final volumes and areas for Project completion claims.