DATE

Dec 2013 – Feb 2014

REFERENCE

Andrew Tonner

Sandfire Degrussa

Provide survey shift cover;

  • Evaporation pond construction
  • Road white line marking over 8km
  • Airstrip Apron and Taxiway Line Marking
  • Haul Road Construction Surveying