TOM PRICE – CLARIFICATION WATER TANK – G&S ENGINEERING

Construction Surveying for a Clarification Water Tank, Pump Station, Switch-room and Transformer next to an existing Thickener. Establish Control and adopt Elevation Datum at Tie in points. Design in MGA Zone 50 – adopt 1:1 Scale. Total Station Setouts and checks, Concrete Pre-Pour Surveys and Holding Down Bolt Surveys. Sub Frame Survey for Pre-fab Switch-room Landing. Earthworks Setout for Cut/Fill and Rock Placement. Setout Bollards, Earth Grids Crash Barriers and Concrete Footpaths.