DATE

June 2017 – November 2017

REFERENCE

Josh Haynes

Tom Price Tailings Southern Cell Expansion – Rio Tinto

Survey Provision for the construction of the South Cell Expansion of a Tailings Dam for Rio Tinto in Tom Price. Reconstruct a complete design based on provided digital centrelines and PDF Plans. Create Machine Control Models for Leica Excavator, Trimble Grader and Trimble Dozer. Provide levels, stockpile volumes and boundary clearing lines for the Borrow Pit. Provide Lift Volumes by Design at 0.15m increments. Draft keyway designs for Machine Control, based on PDF Design Plans.