DATE

August 2014

REFERENCE

Tyrone

Paraburdoo – Rio Tinto

Construction Grid set-out for Holding Down Bolt Sets in Concrete. Tie in Construction Grid to existing Crusher Infrastructure from provided plans and field observations. Provide Vertical datum locations for construction.