DATE
September 2012 – March 2013
REFERENCE
Garry Plautz
Photos by Site Superintendent – Garry Plautz
Yarrie Airstrip
Provide survey levels and locations for Airstrip Construction including Machine Control Grader setup and 3DMC TP3 design file provision. Maintain and update As-construction data base and provide volume calculations for Top Soil and Airstrip fill materials. Ascon PAPI Light projection angles and service conduit ascons.