DATE
April 2022 – June 2022
REFERENCE
Karl Cook
PILGANGOORA SOLAR FARM – HYBRID
Solar Farm Setout for Drill Hole Locations and Centres of Stabilised Fill, for Piling. RTK GPS equipment provision for the term of the Project.
April 2022 – June 2022
Karl Cook
PILGANGOORA SOLAR FARM – HYBRID
Solar Farm Setout for Drill Hole Locations and Centres of Stabilised Fill, for Piling. RTK GPS equipment provision for the term of the Project.